Facebook Facebook (03) 9763 9982 Enquire
CALL (03) 9763 9982

 

With 40 years of combined experienced and an accolade of industry awards, New Wave Electrical Contractors devotes time and resources to constantly raise the bar and set new standards amongst the electrical industry.

Client: Total Construction Pty Ltd

 

Project: Allity Claremont Terrace - 231 McKinnon Road, McKinnon VIC 3204

 

Description: Upgrade and installation of new substation and main switchboard. Upgrade to all distribution boards and all common areas lighting and power including new kitchen fit out, servery and dining rooms. Complete refurbishment of Level 1 bedrooms.

 

 

Allity 1

Allity 2

 

Client: Fimma Constructions Pty Ltd

 

Project: Dunlop Pavilion - 31-35 Dunlop St, Malvern East VIC 3145

 

Description: Demolition of existing pavilion. Wire and installation of new pavilion. Replacement of main switchboard. Installation of new incoming mains.

 

 

Dunlop 1

Dunlop 2

 

Client: APM Group (Aust) Pty Ltd

 

Project: Lowther Hall Early Learning Centre - 17 Leslie Rd, Essendon VIC 3040

 

Description: Complete electrical fit out of new ealy learning centre including installation of all general and special purpose power and acble support systems, lighting, main distrubition board, AV, MATV system, voice & data communications system.

 

Lowther 1

Lowther 2

 

Client: Hansen Yuncken Pty Ltd

 

Project: Hamer Hall - Melbourne Arts Centre - 100 St Kilda Rd, Melbourne VIC 3000

 

Description: Upgrade and refurbishment of lighting and power in Hammer Hall Theatre. Complete strip out of all redundant electrical services. Wiring and installation of all power associated with new Digital Learning Hub inclusive of soft wired systems, relocation of existing sub board, ceiling mounted power points. Wire and install all lighting and lighting control, all wired through C-Bus, including DLT switches, sensors, dimmers and relays. Wire and installation of Famco monitoring emergency lighting system.

 

Hammer 2

Hammer 1

Client: Future Capital Group Pty Ltd

 

Project: Belview Apartments - 5-9 Blanch St Preston VIC 3072

 

Description: Complete electrical fit out of new ten storey apartment complex consisting of 114 one and two bedroom apartments including installation of all lighting and power, new mains and submains cabling, new main distribution board and floor distribution boards. Installation of Voice & Data communications system, MATV system, Emergency telephone system, Fire indicator panel and fire detectors.

 

 

 

Client: Austin Health - Capital Works

 

Project: The Royal Talbot Rehabilitation Centre - 1 Yarra Blvd, Kew VIC 3101

 

Description: Due to expansion of services being provided at Royal Talbot, it was determined that it was necessary to upgrade the incoming Citipower Substation #1 supply from 1000kVA to 1500kVA. The aged existing 415V Main Switchboard was not suitable for the upgrade to meet the requirements of “Victorian Electricity Distributors – Service and Installation Rules 2005” (SIR’s) in relation to essential services supplies distribution architecture and back up generation connection.

New Wave Group installed new Main Switchboard and incorporated power factor correction in the design to meet Austin Health criteria of 0.90 lagging or better at load.

 

 

 

 

Client: Royans Melbourne Pty Ltd

 

Project: 14 Royan Place, Bayswater North VIC 3153

 

Description: Complete design and fitout of large office and multiple factories including installation of Cbus light automotion system. Installation of light and power in office and throuout factories. Installation of data and CCTV. LED light upgrade.

 

Client: Ducon Building Solutions

 

Project: Frankston Arts Centre - 27/37 Davey St, Frankston VIC 3199

 

Description: Complete refurbishment of back stage area. Installation of light and power. Electrical upgrade of control room. Upgrade of dry fire.

 

 

 

 

 

Client: Civic Crown Pty Ltd

 

Project: Blue Cross Animal Society of Victoria - 26 Homestead Rd, Wonga Park VIC 3115

 

Description: Installation of light and power to new animal shelter including quarantine builtings, laundies and kitchens. Upgrade of incoming mains. New Wave had to coordination installation in a way that both old animal shelter building and new animal shelter building are opratiational at the same time.

 

 

Client: Schiavello Construction (VIC) Pty Ltd

 

Project: ESRI Office Refurbishment - 611 King St, West Melbourne 3003

 

Description: Supply and installation of new mains from new CT connection point to the main switchboard (MSB). Supply and installation of a new MSB. Supply and installation of all lighting and power to ground level and level 1. Supply and installation of all power outlets and/or connections to equipment, cabling, ducts, conduits and associated accessories. Wiring and connection to equipment. Supply and installation of communication services.

 

 

 

Client: Total Construction Pty Ltd

 

Project: Central Park Aged Care - 101 Punt Road, Windsor VIC 3181

 

Description: Supply and installation of new main switchboard, new underground consumer main from substation to new main switchboard location. Supply and installation of new meter panel and CT. Supply and installation of all lighting, power and communication services, including fibre link from level 6 to level 1 communications room and new 100 pair cable from level 6 to existing MDF room on ground floor. Supply and installation of MATV system linked into existing MATV system including relocation of existing antenna on roof. Supply and installation of submains to the mechanical, lifts, hydraulic and fire services equipment switchboards. Supply and installation of portable generator connection.

 

 

Client: LOJAC Civil Pty Ltd

 

Project: 12 Bridge Rd, Melton South VIC 3338

 

Description: This project was a gated development with 48 homes. Works included supply and installation of electrical conduits, electrical pits, street lighting, pole mounted security cameras, NBN conduits, NBN pits, Main Switchboard, Mater Panels.

 

 

Client: Balmain & Co. Pty Ltd

 

Project: Summit Apartments - 9-11 Williamsons Rd, Doncaster VIC 3108

 

Description: Supply, installation, testing and commissioning of new mains cabling, submains cabling, new main distribution board and floor distribution boards, all lighting and associated cabling and accessories, all general and special purpose power. Installation of complete imbedded network throughout building. Installation of voice & data communications system and MATV system. Installation of Fire indicator panel, Fire and EWIS system as per FER. Installation of Emergency telephone system.

 

 

Client: 2Construct Pty Ltd

 

Project: Morton Park Pavilion - 35 Central Rd, Blackburn VIC 3130

 

Description: Supply, installation, testing and commissioning of data communications systems and NBN. Installation of ground lighting. Supply and installation of all lighting and associated cabling and accessories thoughout new building.  Installation of switchboard and power throughout new buildings.